Thursday 28 February 2013

WEEK 6 - Designing The Mechanical's Part


  • After done designed turbine in previous week, this week I focus to designing mechanical's part.
  • Mechanical's part included tank for water storage, turbine that being connected to motor thru spocket and chain.
Mechanical's Part Of Mini Hydroelectric Turbine.



FYP 2 Students,
Azri Sabri

Saturday 23 February 2013

WEEK 5 - Designing Turbine


  • One of the most important part in my project is turbine.
  • The rotation or turbine will generate the motor for produce the current.
  • the design of the turbine is base on the sample that I been research.
Pelton Turbine

  • Base on ideology of pelton turbine, i had designed turbine by my own way using hexagon block and spoon as a blade.
  • The turbine as shown in picture below.


FPY 2 Students,
Azri Sabri

Wednesday 13 February 2013

WEEK 4 - Purchased Components (Mechanical's Part)


  • Looking for components at Jalan Pasar.
  • Components use is the important thing to make circuit or project operate.
  • Selection of main component should have in a market because some component needs to order from other company such as bearing type 'pillow block'. Only certain shops have it.
  • So by listing all the components used first will make easy to find and design the project












FYP 2 Students,
Azri Sabri

Saturday 9 February 2013

WEEK 3 - Research On The Components (Mechanical's Part)


  • Starting doing research on the components that being used in my project...
  • My project "Mini Hydroelectric Generator" is about how the water energy can produce an electricity.
  • So for build on my project, there's got 2 part, which is Mechanical's Part & Electrical's Part.
  • For this week, I need to focus on part of mechanical.
  • List of components:
  1. spoon
  2. aquarium tank
  3. 'L' aluminium
  4. sprocket (2 sizes)
  5. bearing (variety sizes)
  6. chain
  7. screw and nuts
  8. cylinder rod






FYP 2 students,
Azri Sabri